MIRAGIST
Back to Wiki
Ground StationUpdated Nov 9, 2026

Ground Station show-day checklist

T-minus 90 to T-minus 0 — the same checklist our show ops use on every production.

T-90 to T-30

  • Confirm RTK fix on all base stations (primary + redundant).
  • Verify mission upload integrity — hash matches Studio export.
  • Walk geofence boundaries with the safety officer.

T-30 to T-0

  • Batch power-up; resolve any amber tiles before T-15.
  • Lighting test pulse at T-10.
  • Final go/no-go from show director and safety officer at T-3.